Access Plan
Target | Strategies | Outcome | Time Frame | Evaluation | |
SHORT TERM | Put up new sinage for main building and car park | Find appropriate sinage and put up | Signs up and clear access to building & car park | 2006 - 2007
| |
Fire escape sinage in place. | Find appropriate sinage and put up | Signs up | 2006 - 2007 | ||
Signs for toilet | Find appropriate signs & put up. | Signs up | 2006 - 2007 | ||
MEDIUM TERM | Make sure all hand rails are sufficient | Check all handrails inside and out | All steps have handrails | Before end 2008 | |
Add a handrail to other side of ramp | Erect handrail on other side of ramp | Two handrails on ramp | Before end 2008 | ||
Coloured nosing to be provided on the edge of steps | Get maintenance person to paint on appropriate colour | Steps painted on nosing | Before end 2008 | ||
LONG TERM | Work towards having a major building project to incorporate a new hall, disabled access on lower level and disabled toilet on both levels | Work with R Stephens and Astam designs to plan and achieve this | New Hall. Disabled access at lower level. Disabled Toilets | As soon as possible | |
Add automatic doors to main entrance | Look into cost of automatic doors | New automatic doors in place | As soon as possible |